I-17 Dunlap Avenue to Deer Valley Road Pavement Rehabilitation

Project Owner: Arizona Department of Transportation (ADOT)
Project Type: Design-Bid-Build
Construction Dates: 09/22 to 08/23

Achen-Gardner worked with Emery Sapp & Sons (ESS) on an ADOT pavement rehabilitation project that took place on select weekends. Achen-Gardner performed emergency spall repairs throughout the I-17 corridor between Dunlap Road and Pinnacle Peak Road. Our knowledge of the local market, suppliers, and equipment in the Arizona area has allowed ESS to expedite lead times in procurement and schedule. In addition, Achen-Gardner was prepared to provide support in emergency situations.

Achen-Gardner is a local, employee-owned firm and a member of a nationwide family of contractors, of which ESS is the flagship.

The scope of the whole project included:

  • Removing the existing asphalt pavement and repairing existing concrete pavement.

  • Diamond grinding existing concrete pavement to provide a smooth roadway surface.

  • Making bridge deck pavement repairs.

  • Replacing pavement markings, including lane line stripes, and other miscellaneous work.

Visit ADOT’s website to receive project updates and traffic alerts.