STREET TRANSPORTATION DEPARTMENT GENERAL CONSTRUCTION

Project Owner: City of Phoenix
Project Type: Job Order Contracting
Construction Dates: 07/17 to 07/20

This JOC includes a variety of civil construction including asphalt and concrete paving, concrete structures, removal and replacement of curb and gutter, wet utility improvements, storm drain and catch basins, etc.

Job Order #1: The Flower Street to Thomas Road project included 1,116 SY of asphalt pavement, 459 SF of sidewalk/driveways, 153 LF of curb and gutter, 2,205 LF of 18” storm drain, catch basins, and 20 sanitary sewer service relocations.

Job Order #2: The Montezuma Street and Carson Road project included 329 SY of asphalt pavement, 2,566 SF of sidewalk/driveways, 448 LF of curb and gutter, five water meter boxes, and 100 LF of drainage grading.

Job Order #3: The 3rd Street - Vogel Avenue to Mountain View Road project will include the removal and replacement of non-ADA-compliant curb ramps, the repair of deteriorated or damaged concrete curb, gutter, and sidewalk, the installation of new ADA-compliant curb ramps, and asphalt pavement replacement.