MCCLINTOCK DRIVE AND MCKELLIPS ROAD WATERLINE

Project Owner: Salt River Pima-Maricopa Indian Community
Project Type: Design-Bid-Build
Construction Dates: 02/20 to 06/20

The team of Pimara Construction and Achen-Gardner Construction installed more than 11,000 LF of water line (4”, 6”, 8”, 12”, and 16”), 56 valves (4”, 6”, 8”, 12”, and 16”), and 12 fire hydrants, and replacing more than 7,600 SY of asphalt, 24,500 SF of sidewalk, 220 LF of curb and gutter, and 800 SF of concrete apron and valley gutter.