Roosevelt Irrigation District

Project Owner: Roosevelt Irrigation District
Delivery Method: Job Order Contracting
Construction Dates: 09/21 to 09/26

This JOC included:

  • General site construction – clearing, grubbing, grading, trenching, compaction, backfilling, and fencing

  • Excavating, grading constructing, and installing concrete lined canals, earthen ditches, and irrigation pipe

  • Constructing and installing concrete structures – manholes, headwalls and control structures

  • Constructing and surfacing roads, streets, and operation and maintenance access roads

  • Drilling, casing, and developing wells

  • Supplying and installing electrical/mechanical equipment

  • Utility relocation

  • Construction survey and as-built survey