Roosevelt Irrigation District
Project Owner: Roosevelt Irrigation District
Delivery Method: Job Order Contracting
Construction Dates: 09/21 to 09/26
This JOC included:
General site construction – clearing, grubbing, grading, trenching, compaction, backfilling, and fencing
Excavating, grading constructing, and installing concrete lined canals, earthen ditches, and irrigation pipe
Constructing and installing concrete structures – manholes, headwalls and control structures
Constructing and surfacing roads, streets, and operation and maintenance access roads
Drilling, casing, and developing wells
Supplying and installing electrical/mechanical equipment
Utility relocation
Construction survey and as-built survey