North Tempe Waterline Replacement

Project Owner: City of Tempe
Project Type: Construction Manager at Risk
Construction Dates: 6/23 to 4/24

This project includes approximately five miles of 8” and 12” waterline replacements throughout neighborhoods and along a high-volume arterial street. Also included are service connections, fire hydrants, other water appurtenances, sidewalks, curbs, gutters, driveways, pavement replacement, etc., as needed to complete the project.

The project includes approximately 4.6 miles of 8” and 12” waterline replacements as follows:

  1. Papago Manor Neighborhood/Concord Village will include a total of approximately 2.0 miles of 8” waterline replacements.

  2. Rio East Neighborhood will include a little more than 1 mile of 8” and 12” of waterline replacements.

  3. Curry/Stadem/Miller Area will include a total of approximately 0.5 miles of 8” waterline replacements.

  4. Eaton University Industrial Park will include approximately 1100 feet of 8” waterline replacement.

  5. Rolling Hills Golf Course will include approximately 1200 feet of 8” waterline replacement.

  6. Maple Ash Neighborhood will include less than 1 mile 8” and 12” waterline replacement.